Case Study

903 Coatings

2026 / Industrial Manufacturing

The Challenge

903 Coatings faced severe production bottlenecks caused by an unreliable workforce and a disorganized facility. High turnover meant knowledge was never retained, while a chaotic shop layout—cluttered with idle inventory and broken equipment—forced staff to spend hours locating basic tools, resulting in potential inconsistent quality from hired help on complex, custom projects. This required the business owner to work on every single project himself, constricting operations.

The Solution

We proposed a systematic operational overhaul to transition the shop from reactive labor to a high-efficiency production model.

The Outcome

This multi-layered approach was designed to transform the shop’s culture and output. By professionalizing the hiring process, the company would retain skilled staff capable of handling high-end custom jobs. Simultaneously, the shop redesign and automated preparation machinery were engineered to turn unpredictable, manual-heavy workflows into a predictable, high-margin production environment.

KPIs (2026)

New Hire Time to Compentency 80 Hours for 100%
Project Success Rate + 50%
Estimated Labor Productivity + 60%