Mastec Inc

2026 / Infrastructure Engineering and Construction

The Challenge

Operational inefficiencies in fiber optic deployment, specifically unready job sites and missing critical materials, resulted in excessive downtime. Crews frequently faced six-hour round trips back to central staging to retrieve forgotten components, causing daily standstills, eroding contract margins, and increasing the risk of damaging existing underground infrastructure.

The Solution

The Outcome

By replacing reactive logistics with standardized pre-departure protocols and localized inventory, we eliminated the "standstill" culture. The operational shift stabilized contract timelines, protected project margins, and significantly reduced safety incidents caused by unmapped utility strikes.